glekIBS.gif (2382 bytes)                                                                             

 

 

 

The Inter-Power group of companies is active in the fields of Electric Energy Production, Modular Construction and Real Estate Leasing. Wholly-owned affiliates such as GLEKO Wohnbau GmbH, headquartered in Munich (Germany), have constructed and own prime office buildings  complexes in various parts of Germany.

Another Germany based wholly owned affiliate, Integrated Building Systems ("IBS") grants world wide licenses for its state-of-the-art modular construction system. The IBS concept, suitable for residential, office and commercial buildings is based on a unique connection method that allows for quick on-site bolt-connectivity of the basic building elements, rendering costly and time consuming joint pouring as well as load-bearing or reinforcing walls obsolete.

Another noteworthy feature of the IBS system is its inherent resistance against earthquakes.

For a detailed account on the system's earthquake resistance, click   

 

 

 

 

Co_info.gif (1959 bytes)        

Email.gif (1854 bytes)

Home.gif (1843 bytes)           

Next.gif (1832 bytes)                         

Back.gif (1849 bytes)                                                                 

Nuts and bolts connect the IBS columns to the slabs. The triangular shaped metal corner joint serves as the standard  connecting element. Just a few construction workers can complete an entire floor within two weeks.

 

 

Back | Company Infoe-mail | Home | Next